熟女人妇交换俱乐部-色综合天天干-一级黄色片看看-午夜男人的天堂-亚洲va韩国va欧美va精四季-亚洲玖玖玖-日本少妇三级hd激情在线观看-人成午夜免费视频在线观看-日本骚少妇-欧美色视-日韩精品无码久久一区二区三-久9在线-欧美成人a∨高清免费观看-亚洲男人电影天堂无码-无码人妻精品一区二区三区久久久

中文
Projects
Digital Maintenance Management Platform of Chongqi Bridge

Following the concept of “special maintenance for special bridge”, it deeply digs the structural characteristics of Chongqi Bridge and the data of inspection and monitoring and engineering maintenance during the operation period. Based on the data fusion algorithm model, taking the “BIM+” visual model as the platform, the informationization model based on the standardized management and maintenance data is constructed, the existing inspection and monitoring and operation related systems are integrated, and the multi-system integrated data visual management is realized by using the BIM multi-level modeling technology, and the “Smart Space” of the bridge is created.


Back

Innovation Points

1. Structure Response Digital Twin Technology Based on Dynamic Weighing System

Through the real-time analysis of the axle load, vehicle speed and lane information of the weigh-in-motion system, combined with the pre-established precise finite element simulation model and the developed data processing algorithm, the rapid analysis and early warning of the deflection and stress response of the bridge under the action of vehicles are realized.

2. Unmanned Aerial Vehicle (UAV) Bridge Inspection Technology Based on Intelligent Flight Control and Flight Path Management

Aiming at the characteristics of Chongqi Bridge over the Yangtze River, the technology of Unmanned Aerial Vehicle (UAV) Bridge Inspection Technology Based on Intelligent Flight Control and Flight Path Management is innovated, and a three-dimensional and blind-zone-free inspection system is constructed by customizing the automatic inspection route of unmanned aerial vehicle. The traditional inspection mode is changed from a field operation mode to an indoor operation mode, and the inspection report is automatically generated, so that the inspection efficiency is greatly improved, the safety risk is reduced, the labor cost of later data processing is saved, and the bridge is comprehensively evaluated in the aspects of technical condition, reliability, durability, applicability and the like.

3. The Digital Twin Base of River-crossing Bridge with BIM+GIS has been Constructed.

Following the advanced concept of “level-to-level management and classified treatment”, and by establishing a refined big data model of multi-source integration of “patrol, inspection and monitoring”, and taking components as the information transmission link, the multi-data source such as monitoring, detection and weighing system and the bottom logic of the back-end data platform are connected, so as to realize multi-application linkage display and integrated multi-source data fusion application of “patrol, inspection, supervision and evaluation”.